Cam Mac Past Projects


Selected Past Enviromental Projects

 

IN-SITU BIOREMEDIATION PROJECTS


Remediation of 750 cubic meters of soil impacted with diesel, oil and gasoline. Salmon Arm, B.C.


Air sparging system of deisel and gasoline impacted soilsKamloops, B.C


Bio slurping system for diesel impacted soils.Kamloops, B.C


Remediation of 22,000 cubic meters of soil impacted with diesel, oil and gasoline. Prince George, B.C.


Air sparging systems. Hydrocarbon impacted soils.Kamloops, B.C
Remediation of 250 cubic meters of soil impacted with diesel and gasoline. Kamloops, B.C.


Remediation of 6 Flare Pits of clay soils.
More About Bioremediation Click Here

EX-SITU BIOREMEDIATION PROJECTS

Biocell construction and treatment of 3000 cubic meters of soil impacted with diesel, oil and gasoline. Penticton, B.C.

Biocell construction and treatment of 1500 cubic meters of soil impacted with diesel, oil and gasoline. Penticton, B.C.

Biocell construction and treatment of 3000 cubic meters of soil impacted with diesel, oil and gasoline. Kamloops, B.C.

Biocell construction and treatment of 750 cubic meters of soil impacted with diesel and gasoline. Project also included removal and disposal of underground tanks and associated piping. Kamloops, B.C.

Biocell construction and treatment of 1000 cubic meters of soil impacted with diesel, oil and gasoline. Project included removal and disposal of underground tanks and associated piping. Merritt, B.C.

Biocell construction and treatment of 400 cubic meters of soil impacted with diesel, oil and gasoline. Armstrong, B.C.

Biocell construction and treatment of 900 cubic meters of soil impacted with diesel, oil and gasoline. Project included removal and disposal of underground tanks and associated piping. Salmon Arm, B.C.

Biocell construction and treatment of 575 cubic meters of soil impacted with diesel, oil and gasoline. Kamloops, B.C.

Biocell construction and treatment of 250 cubic meters of soil impacted with diesel, oil and gasoline. Kamloops, B.C.

Biocell treatment of 300 cubic meters of soil impacted with diesel, oil and gasoline. Kelowna, B.C.

Biocell treatment of 450 cubic meters of soil impacted with diesel, oil and gasoline. Lumby, B.C.

Biocell treatment of 1800 cubic meters of soil impacted with diesel, oil and gasoline. Kamloops, B.C.

Biocell treatment of 1600 cubic meters of soil impacted with diesel, oil and gasoline. Clinton, B.C.

Biocell treatment of 225 cubic meters of soil impacted with diesel, oil and gasoline. Kamloops, B.C.

Biocell construction and treatment of 5000 cubic meters of soil impacted with crude oil. Gull Lake, Saskatchewan

Biocell treatment of 1500 cubic meters of soil impacted with crude oil. Hays, Alberta

Biocell treament of 1800 cubic meters of invert drill mud and drill cuttings.Pink Mountain, B.C


LANDFILL DISPOSAL PROJECTS

Excavate, transport and dispose of 20,000 cubic meters of soil impacted with diesel, oil and gasoline , Lethbridge, Alberta

Excavate, transport and dispose of 450 cubic meters of soil impacted with diesel, oil and gasoline , Vanderhoof, B.C.

Excavate, transport and dispose of a total of 1000 cubic meters of soil impacted with diesel and gasoline. Project also included demolition of existing buildings as well as removal and disposal , Lethbridge, Alberta

Excavate, transport and dispose of 500 cubic meters of soil impacted with diesel and gasoline. Project also included removal and disposal of underground tanks and associated piping. , Calgary, Alberta

Excavate, transport and dispose of approximately 3700 cubic meters of soil impacted with diesel, gasoline and waste oil. , Calgary, Alberta


UNDERGROUND STORAGE TANK, REMOVAL AND REPLACEMENT PROJECTS

Removal and replacement of three 5000 gallon storage tanks and associated piping. , Lethbridge, Alberta

Removal and replacement of three 5000 and 6000 gallon gasoline storage tanks and associated piping. , Quesnel, B.C.

Removal and replacement of one 2000 gallon diesel storage tank and associated piping , Cranbrook, B.C.

Removal of three 8000 gallon gasoline storage tanks and associated piping , Quesnel, B.C.

Removal of one 3000 gallon gasoline and one 3000 gallon diesel storage tanks and associated piping. , Kelowna, B.C.

Removal of four 23,000 litre gasoline storage tanks and associated piping , Victoria, B.C.

Removal of various gasoline, diesel and waste oil storage tanks and associated piping for the Fleet and Facilities Department at various locations throughout the City of Calgary , Calgary, Alberta


FUEL SYSTEM INSTALLATION PROJECTS

Installed 0.5 million gallon Jet B Aviation fuel storage tank and one 380,000 gallon diesel storage tank, complete with piping, loading racks, dikes and barge lines , Yellowknife, N. W. T.

Installed one 2000 gallon Jet B Aviation fuel storage tank complete with double-walled flex piping and remote pumping system , Kelowna, B.C.

Installed three 8000 gallon gasoline tanks and associated piping , Duncan, B.C.

Installed one 10,000 and one 5,000 gallon gasoline tanks and associated piping. , Kelowna, B.C.

Installed two 8000 gallon gasoline tanks and associated piping , Duncan, B.C.

Installed five 8000 gallon gasoline and diesel storage tanks and associated piping , Merritt, B.C.

Installed five 8000 gallon gasoline and diesel storage tanks and associated piping , Penticton, B.C.

Installed various gasoline, diesel and waste oil storage tanks and associated piping for the Fleet and Facilities Department at various locations throughout the City of Calgary , Calgary, Alberta


FACILITY CONSTRUCTION PROJECT

Constructed 92,500 sq. ft. double lined Provincial Fire Training Centre, complete with 113,000 litre oil/water separator, mock aircraft, 50,000 litre aboveground fuel tank and associated piping. , Prince George, B.C.

 